Se rendre au contenu
  • Se connecter
  • EN FR
Goshop Energy
  • Nos solutions
    • Industries
    • Maisons, commerces et PME
    • Écoles, cliniques et communautés
    • Revendeurs et installateurs
    Nos solutions Système d'énergie solaire Stockage d'énergie Groupes électrogènes Pompage d'eau Protection contre la foudre Projets
    Simulateur de rentabilité Produits et marques Travailler avec GoShop Maintenance
    Nos solutions Kits solaires Pompage Solaire Générateurs Domestiques Projets eMobility
    Configurateur /Dimensionnement Conseils pratiques Support Technique
    Solutions Kits solaires Pompage Solaire Générateurs Domestiques Projets
    Mini Réseaux Activités génératrices de revenus GoShop Academy
    Programme partenaires Marques GoShop Academy
    Trouver un partenaire Garantie
  • Nos produits
    Icône Kits solaires pico et portables Kits solaires pico et portables
    Icône Panneaux solaires et kits Panneaux solaires et kits
    Icône Batteries solaires et kits Batteries solaires et kits
    Icône Pompes solaires et kits Pompes solaires et kits
    Icône Groupes électrogènes Groupes électrogènes
    Voir tous les produits
  • Nos projets
  • Marques
    • Victron
    • EcoFlow
    • GoodWe
    • GoPower
    • Teksan
    • Citel
    • Indelec
    • Lorentz
    • Grundfos
  • À propos
  • Aide
  • 0
  • Contact us

    Social Media

    Cliquez ici pour configurer vos réseaux sociaux
Goshop Energy
  • 0
    • Nos solutions
      • Revendeurs et installateurs
      • Maisons, commerces et PME
      • Industries
      • Écoles, cliniques et communautés
    • Nos projets
  • Se connecter
  • EN FR
  • Contact us

    Social Media

    Cliquez ici pour configurer vos réseaux sociaux
Our Projects • 24/05/2025

Anoalite Hospital: Optimized Solar Energy for a Lasting Impact

Update on the photovoltaic project at Anoalite Hospital in Mungbere, Haut-Uele, by GoShop Energy. The article describes the installation of a three-phase system with a capacity of 63 kWp, 45 kVA, and 60 kWh in May 2025, designed to provide reliable green energy. This update includes configuration improvements, regular maintenance, on-site staff training, and the setup of a VRM account for remote monitoring. This represents a significant step toward energy self-sufficiency for the healthcare facility.

République démocratique du Congo
C02 reduction icon

50%

CO2 reduction

icon

50%

energy saving

icon

6.000

tons produced every year

In May 2025, we installed a three-phase system with a capacity of 63 kWp, 45 kVA, and 60 kWh at Anoalite Hospital in Mungbere, located 235 km from Durba and 135 km from the city of Isiro in the Watsa territory of Haut-Uele province. In doing so, we resolved a previously existing issue of limited access to clean and reliable energy. The system has been operational ever since.

To ensure the long-term sustainability of solar energy at this healthcare facility, we are continuing our work on the project. It is essential to adapt to local conditions while continuing to train local teams in site management.

As a reminder, the project was launched on May 4, 2025. It includes a capacity of 63 kWp, three 45 kVA inverters, and a storage capacity of 60 kWh, which provide the necessary energy for the entire hospital. For additional information, please click here.

Our upgrade included:

A system configuration optimized to precisely meet their requirements, thereby ensuring the continuity of essential services throughout the facility;


We provide ongoing maintenance and monitoring to ensure the equipment operates optimally at the hospital, including 24-hour operational lighting. Two 2000 Wp electric pumps are in operation between 9 a.m. and 11 a.m., 2 p.m. and 4 p.m., and 6 p.m. and 8 p.m.;


Five individuals, including the client himself, his maintenance technician, and three members of his team from Italy, received training on the operation, monitoring, and maintenance of the system, 


the setup of a VRM account for the client and his team, enabling effective remote management;


Thorough review of all system configurations;

Final photos taken to commemorate the completion of this crucial phase of the project;




This milestone marks significant progress toward energy independence for Anoalite Hospital. Thanks to all these improvements and the active involvement of the staff, the facility is now managed with unparalleled expertise and confidence.


GoShop Energy is dedicated to providing tailored support to each client, paying attention to every detail.

Please feel free to contact us for more information

GoShop Energy, Your Energy Provider




Share the project:

  • Our Company
  • About us
  • Our offices
  • Our events
  • Our blog
  • Jobs
  • Our brands
  • Partner Program
  • Find a reseller
  • Support
  • Support form
  • Conditions of Sale and Warranty
  • GoShop Academy
  • Let's Connect
  • Facebook
  • LinkedIn
  • X
  • Youtube
  • Instagram

See how we can help you. Get in touch today.

Chat with us on WhatsApp

Get in touch

Or call +243 991 473 328
Goshop Energy Logo

© 2026 GoShop Energy. • Privacy Policy